Home services products resources contact us
Contacting QualTech NP
company information
  Company Profile
Developing greater safety-related products and services through innovation and testing
Capabilities
State-of-the-art facilities for the design, manufacturing and assembly of a variety of nuclear solutions
Quality Programs
To meet the demanding requirements of the nuclear power industry
Careers
Discover more about career opportunities at Curtiss-Wright Flow Control
 
Capabilities
State-of-the-art facilities for the design, manufacturing and assembly of a variety of nuclear solutions

QualTech NP CampusQualTech NP is a multi-functional organization capable of efficiently processing a small replacement part order as well as executing a large-scale fabrication/installation project. We are structured with self-contained mini-organizations to handle the routine replacement part inquiries and orders as well as qualification testing. We also maintain a larger functional organization to handle the more complicated design and build projects.

QualTech NP also supports the localization efforts of the global nuclear power industry by supporting OEMs and manufacturing teaming partners worldwide. In these cases we are very innovative in utilizing our teaming partners both locally, abroad and resources within the Curtiss-Wright Flow Control organization to enable us to bid and fulfill our customers' requirements.

All of our products and services are supported by our 24/7 emergency service by calling 513-528-7900 and following the instructions for emergency service.

Facility Equipment & Capabilities

Facility & Capacities
Facility Locations: Cincinnati and Batavia, Ohio USA
Overall Area: 53,000 sq. ft.
Total Employees: 80
   
Cincinnati, OH  
Overall Square Feet: 48,000 sq ft
Center shop: 40' x 110': 4,400 sq ft
Door opening: 13'-11" wide x 13'-9" high
Crane height: From floor to hook is 14'-11 "
Crane capacity: 2 - 10 ton (overhead cranes)
     South shop       68' x 110': 8,580 sq ft
     Crane height:       From floor to hook is 15'
     Crane capacity:       1 - 5 ton (overhead cranes)
     Lower south shop       40' x 110': 4,400 sq ft
     Door opening:       15'-8" wide x 16'-1" high
     Crane height:       From floor to hook is 19'
     Crane capacity:       2 - 10 ton (overhead cranes)
   
Batavia, OH  
Shop: 46' x 120': 5,520 sq ft
Door opening: 16' wide x 12' high
Crane height: From floor to hook is 35'
Crane capacity: 2 - 60 ton (overhead cranes)
   
Hunsville, AL  
Overall Area: 48,000 sq. ft.
Seismic Testing: Triaxial Seismic Table
Steam Testing: LOCA/MSLB Steam Chambers (2)
Humidity Testing: Tehperature Humidity Chambers (3)
Gas Analysis: FTIR Analyzer
Metallurgy: X-Ray Metals Analyzer
Environmental Testing: Single Axis Simulator (RIM Testing)
Submergence Testing: Submergence Chamber
Nitrogen Testing: Nitrogent Gas Generation System
Electrical: Multi Amp Current Testers (2)
Product Development Services
  • Structural Design Finite Element Analysis
    • ALGOR
    • ANSYS
  • CAD
    • AutoCAD
  • 3D Design
    • Autodesk Inventor
  • Reverse Engineering
  • In-house Mechanical / Electrical Designers
Weld Shop
  • One Miller Shopmaster 300 (M.I.G. & Stick Welder)
  • One Miller Syncrowave 250 AC-DC (T.I.G. & Stick Welder)
  • One Miller Dialarc 250 AC-DC (M.I.G. & Stick Welder)
  • One Millermatic 200 (M.I.G.Welder)
  • One Miller Dimension 452 (M.I.G. & Stick welder)
  • Three Miller Delta Fab (M.I.G. & Stick welders)
  • One Lincoln Square Wave (T.I.G. & Stick Welder)
  • One Lincoln Idealarc CV300 (M.I.G. Welder)
  • One Linde Type CE 300 (M.I.G. & Stick Welder)
  • 3 Miller XMT 456 cc/cv welders (M.I.G., STICK, T.I.G WELDING)
  • 2 Miller S-32P wire feeders for M.I.G. welding
  • One Thermal Dynamics PacMaster 100 (Plasma Torch)
  • Three Acetylene & Oxygen cutting torches
  • One Metal Lax by Bonal Technologies (Stress Relief Machine)
  • Six Welding Rod Ovens
  • One DustPak (Air cleaner)
  • Six Weld Sale Welding Tables
  • Miscellaneous Hand Tools (41/2" hand grinders, 71/4" hand grinders, Belt grinders, ener pac tooling, clamps, and table
    Clamps for weld table, bar clamps, one rotary
    Table for welding, one set of power rollers for
    Welding, two magbase drill presses, one
    Hougen magbase drill press)
Machine Shop
  • One wire E.D.M. machine (Sodick)
  • One Hass Milling Center VF-1 (with 4 axes)
  • One Mazak turning center (with live tooling)
  • One HASS milling center VF-5 (with 4th axis)
  • One Bridgeport's (manual mill)
  • One Allance (manual mill)
  • One Seiki-4VS (3 Axis CNC Control Mill)
  • Milling accessories (two rotary tables, one indexing table, one 90 degree head)
  • One Victor lathe (manual lathe)
  • One Hercules lathe (manual lathe)
  • One Premier Press Brake (120 ton 10' bed)
  • One Meuser Radial Arm Drill
  • One Bovar Schultz (surface grinder)
  • One Reid Brothers (surface grinder)
  • Four table top bench grinders
  • One 5 ton overhead crane
  • Two 10 ton overhead cranes
  • Two 50 ton hand presses
  • One Phase 2 arbor press
  • One Bewo (cold saw)
  • One Grob (band saw)
  • One small cut off saw
  • One Craftsman drill press
  • One hand tapping machine
  • One Solberga Mekaniska auto tapping drill press
  • One Craftsman radial arm saw (wood)
  • One Ingersoll Rand T-30 air compressor
  • Three Dayton air compressors
  • One Speedair line dryer for compressors
  • One Alva Allen punch press
  • Three Craftsman shop vacs
  • Two Caterpillar fork truck
  • One Economy hyd. Worklifter
  • One Blue M oven (0—200 C. for heat treating)
  • One Neyo oven (for heat treating) One Darey drill
    sharpener
  • Koike Aronson Plasma Table 10 Foot X 16 foot
  • Plasma cut up to one inch carbon and torch up
    to four inches
  • Two Hyd Mech S-23A cut off saws
  • One ZERO BLAST sand blasting cabinet
Project Experience List

This section is QualTech NP's Project Experience List that provides a listing of the major contracts and a description of the work performed. The majority of the projects were Nuclear Safety Related and as a result, QualTech NP either implemented their NQA-1 Quality Assurance Program or their ASME Section III Quality Assurance Program. Even projects which were considered commercial, QualTech NP implemented the basic elements of their NQA-1 Program to manage the job properly as well as maintaining an acceptable level of quality. Each of the Projects shown on the Experience List required some level of QualTech NP design, fabrication, subcontracting and testing.

The table below documents a sample of major contracts where QualTech NP employed the same skills and levels of expertise required for fabrication, assembly and test. These projects exercised QualTech NP's design, manufacturing, commercial grade dedication, environmental qualification, and testing capabilities.

Customer Name Work Description Plant Time Worked
Sam Shin Valve Co. Korea Supplied 32 each, Air Actuators for Gate and Globe Valves, including limit switches, solenoid valves and regulators. All items were qualified to RCC-E (1993) and supplied as safety related via commercial grade dedication process. Ling Ao 3 & 4 2007-2009
Westinghouse Pittsburgh, PA Designed and supplied 250 each Squib Valve Connector/Cable Assemblies for AP1000 Reactor Sanmen 2 Haiyang 1 & 2 and additional AP1000 Units 2009-2011
KHNP Korea Supplied approximately 2000 Head Area Prefabricated Cable Assemblies to the KHNP E248 Specification Shin Kori 1&2 Shin Wolsong 1&2 2007-2011
Areva Lynchburg, VA Currently supplying approximately 290 Head Area Prefabricated Cable Assemblies Davis Besse 2011
Flowserve Lynchburg, VA Supplying Gen 3 QDCs for Limitorque Actuators in AP1000 plants. Sanmen 2 Haiyang 1 & 2 and additional AP1000 Units 2010-2012
Topworx Louisville, KY Supplying Gen 3 QDCs for Limit Switches in AP1000 plants. Sanmen 2 Haiyang 1 & 2 and additional AP1000 Units 2010-2012
Valcor New Jersey Supplying Gen 3 QDCs for solenoid valves in AP1000 plants. Sanmen 2 Haiyang 1 & 2 and additional AP1000 Units 2010-2012
Westinghouse Cranberry, PA Performed LOCA and MSIV steam tests for Limitorque actuator qualification. Sanmen 2 Haiyang 1 & 2 and additional AP1000 Units 2010-2011
Topworx Louisville, KY Performed LOCA and MSIV steam tests for Go Switch qualification. Sanmen 2 Haiyang 1 & 2 and additional AP1000 Units 2010-2011
Constellation Energy Supplying one replacement coaxial EPA (12" x 150 lb) for loose parts monitoring system Nine Mile Point 1 2010-2011
Rosemount Nuclear, Qualification test of RNII 315X Transmitters to KTA3505 standard for Areva's European TVO 5 2008-2010
Hyundai Heavy Industries Nuclear Spent Fuel Pool Gates & Control Panels Ulchin 5 & 6 Jan 01 Dec 02
Doosan Heavy Industries Nuclear Traveling Water Screen System Control Panel System Design, Qualification and Fabrication Ulchin 5 & 6 Jul 99 Aug 01
Hyundai Heavy Industries Nuclear Containment Personnel Airlocks, Equipment Hatches and Controls Ulchin 5 & 6 Jun 99 Aug 02
Hanjung Nuclear Containment Personnel Airlocks, Equipment Hatches, Spent Fuel Pool Gates and Controls Yonggwang 5 & 6 Nov 96 Dec 02
NES Nuclear Containment Outage Equipment Hatch Crystal River Feb 99 Sep 99
PSE&G Salem Nuclear Plant Nuclear Containment Outage Equipment Hatch Salem Oct 97 Mar 98
Canatom NPM, Inc. Nuclear Containment Airlocks and Doors Qinshan Units 1 & 2 Jun 98 Mar 00
Westinghouse Savannah River Special Nuclear Material Handling Equipment Savannah River Oct 97 Mar 98
NES Nuclear Containment Outage Equipment Hatch Indian Point 3 Jan 97 May 97
MOX Dedication and qualification of 1,200 HVAC dampers. Partnering agreement with Ruskin Manufacturing. MOX SRS 2010-2012


Request Additional Information

Defense Home Page




about us services products resources contact us site map
© 2006-11 Curtiss-Wright Corporation, All Rights Reserved.
Defense Site Power Site Process Site Visit the home of Curitss-Wright Flow Control Visit Curtiss-Wrights corporate website Defense Site Power Site Process Site CWFC Process CWFC Process Web Site CWFC Process Web Site